3. Post-disaster reconstruction performance

a. Supplying temporary houses: We held a meeting to discuss the supply of temporary houses in the afternoon of Sep. 22 1999. In the meeting, we widely discussed about the units of temporary houses, planning measurement, type and components (Assembly, steel-made, container house), water supply and base and then handed over to the Taipei second office to proceed and offer the concrete method to operate. The number of temporary houses each county or city needs will be based on the damage situation which will be offered by the local government. Besides, the land used to set up temporary houses is government-owned. It involves Taiwan Sugar Corporation, National Property Bureau, Land bank management and Ministry of national defense discarded military camps etc. It will be necessary to negotiate with above units.
b. Public facilities reconstruction. We actively sorted out all public buildings, roads, bridges, tap-water and fuel gas damaged in this earthquake, cooperated on listing budget, using preparation funds and existing budget and used our experts and tools of the heavy machine team to help the post-disaster reconstruction.
c. Reconstruction plan and performance in disaster areas: Disaster areas' reconstruction plan is related to urban planning. We will be the first to do so and research the favorable rules suitable for urban renewal to help reconstruction. The land of temporary houses construction will be controlled in individual areas and treated with some loose regulations.

4. Suggestion for raising the funds

a. Raising the funds for rescue and reconstruction: Except for the second preparation funds provided by Executive Yuan, we suggest using the 4.7 billion dollars of the plan for improving urban and rural features, 6 billion dollars of the living circle road construction and 2.5 billion dollars of improving living quality that were originally listed in post half year of 1999 and 2000. They were going to be in use by readjusting the subject.


b.Set up the post-disaster reconstruction foundation: In order to raise various reconstruction and recovery funds, all must be reasonably distributed and used irrespective of materials or money. We suggest Executive Yuan to set up the post-disaster reconstruction funds and assign specific institution to keep and administrate.

921 Earthquake File
Time: 12.6 sec. 1:47 am Sep. 21 1999(Taipei Time)
Epicenter: North Latitude 23.87¡BEast Longitude 120.75 (Amended by Central Weather Bureau)
Depth: 7.0 Kilometer (Amended by Central Weather Bureau)
Richter Seismic Scale: 7.3 ML(Central Weather Bureau)
Breaking Fault: The surface of the earth on Ju-Long-Pu fault broke. The Main fault is 85 kilometers long, North East section is 11 kilometers. The total length is approximately 98.6 kilometers.


Analysis on building destructive patterns. (Photo by Liang Shou Cheng)

¡@
 
Construction and planning Administration of Ministry of Interior